High-efficiency fractional pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9479050
SERIAL NO

14751996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for generating voltages greater than a supply voltage are described. In some embodiments, a charge pump system may generate a boosted output voltage greater than the supply voltage using one or more charge pump stages that are arranged in series between the supply voltage and the boosted output voltage. A charge pump stage of the one or more charge pump stages may include a plurality of boosting capacitors that are arranged in series and charged to a charging voltage during a charging phase. During the charging phase, each boosting capacitor of the plurality of boosting capacitors may be charged to a fraction of the charging voltage applied across all of the plurality of boosting capacitors. After the charging phase, the plurality of boosting capacitors may be arranged in parallel and each boosting capacitor of the plurality of boosting capacitors may be boosted during a boosting phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANDISK TECHNOLOGIES LLC5080 SPECTRUM DRIVE SUITE 1050W ADDISON TX 75001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reddy, Gooty Sukumar Andhra Pradesh, IN 5 17
Yadala, Sridhar Karnataka, IN 26 271

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00