Phase current regulation in BLDC motors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9479096
APP PUB NO 20150145455A1
SERIAL NO

14531224

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for determining a phase current direction and a zero-crossing moment of the phase current in a sinusoidally controlled brushless direct current motor. The brushless direct current motor comprises a coil per phase and the phase of the brushless direct current motor is driven by a half bridge driver. The half bridge driver comprises a high side field effect transistor and a low side field effect transistor. The method comprising the following steps: measuring the drain source voltage over the high side field effect transistor and low side field effect transistor, and determining the zero crossing moment of the phase current by determining the current direction based on the measured drain source voltages and by determining the moment the current changes direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MELEXIS TECHNOLOGIES NV

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Freitag, Thomas Plaue, DE 41 150
Heynlein, Jan Erfurt, DE 1 3
Paintz, Christian Erfurt-Kerspleben, DE 9 84

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00