Self-contained power and cooling domains

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9483090
SERIAL NO

14336691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for providing for conditioning of a computer data center includes supplying a working fluid from a common fluid plane to a plurality of power/cooling units distributed across a data center facility in proximity to electronic equipment that is distributed across the data center facility; converting the working fluid into electric power and cooling capacity at each of the plurality of power/cooling units; and supplying the electric power to a common electric power plane serving a plurality of racks of the electronic equipment in the data center facility and being served by a plurality of the power/cooling units in the data center facility, wherein the common fluid plane serves at least 10 percent of the power/cooling units in the data center facility and the common electric power plane serves at most 5 percent of the electronic equipment in the data center facility.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOOGLE LLC1600 AMPHITHEATRE PARKWAY MOUNTAIN VIEW CA 94043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clidaras, Jimmy Los Altos, US 61 2579
Malone, Christopher G Mountain View, US 82 2132
Ramesh, Anand Sunnyvale, US 30 189

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 1, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00