Method for embedded feedback control for bi-stable actuators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9488254
APP PUB NO 20140363150A1
SERIAL NO

14091128

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drive mechanism having a bi-stable motor driving an actuator with a high starting torque, and a slower, regulated velocity as the actuator moves through its range of travel. This advantageously maintains high torque margins at low velocity, and lowers the kinetic energy of the bi-stable actuator at end of travel by limiting the terminal velocity and establishing a softer stop. A solenoid may be used in one embodiment. Actual bi-stable motor values are obtained immediately before the move to maintain accurate control of the motor, such as the resistance and inductance of the motor coil. For instance, the bi-stable motor may be driven into a stop, and the coil resistance may be calculated by sensing current associated with the calibration voltage. Inductance may be measured similarly by applying low level AC currents. Back-emf is sensed through the coil resistance, and an estimated motor rotation rate is sent to a feedback loop to maintain the desired rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAYTHEON COMPANY870 WINTER STREET WALTHAM MA 02451-1449

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Griffin, Eric J Ranchos Palos Verdes, US 15 102
Hershberg, Jerry Torrance, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 8, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00