Double-alloy NdFeB rare earth permanent magnetic material and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9492869
APP PUB NO 20140328713A1
SERIAL NO

14047901

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A double-alloy NdFeB rare earth permanent magnetic material and manufacturing method thereof are provided. The method comprises respectively melting an A1 alloy comprising heavy rare earth such as Dy, Tb, Ho and Gd as well as an A2 alloy comprising light rare earth such as La, Ce, Pr and Nd; mixing the A1 alloy and the A2 alloy by a two-dimensional or three-dimensional mixer with a ratio of A1/A2=0˜0.5 under protection of nitrogen; producing powder in a jet mill after mixing; collecting fine powder; putting and mixing the powder and the fine powder in the two-dimensional or three-dimensional mixer; putting into a magnetic field pressing machine for pressing under the protection of the nitrogen after mixing and producing permanent magnetic products by sintering, aging, etc. The present invention can obviously decrease rare earth utilization and increase a magnetic energy product and coercivity of the rare earth permanent magnet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENYANG GENERAL MAGNETIC CO LTDSHENYANG LIAONING 110179

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Haotian Liaoning, CN 6 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00