Plate spring unit and railcar bogie using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9493174
APP PUB NO 20150158506A1
SERIAL NO

14382300

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railcar bogie includes a cross beam to support a carbody of a railcar, a pair of front and rear axles between which the cross beam is located and arranged, respectively, in front of and behind the cross beam in a railcar longitudinal direction and extending in a railcar width direction, bearings provided at both railcar width direction sides of the axles to rotatably support the axles, axle boxes to respectively accommodate the bearings, and a plate spring extending in the railcar longitudinal direction to support one of both railcar width direction end portions of the cross beam and including both longitudinal direction end portions supported by the axle boxes. The plate spring unit includes a plurality of plate springs to elastically deform in an upper-lower thickness direction. The plate springs are arranged in a line in a width direction perpendicular to the longitudinal direction and the thickness direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAWASAKI RAILCAR MANUFACTURING CO LTD1-18 WADAYAMA-DORI 2-CHOME HYOGO-KU KOBE-SHI HYOGO 652-0884

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Enomoto, Masayuki Kobe, JP 102 729
Nakao, Shunichi Kobe, JP 28 238
Nishimura, Takehiro Kobe, JP 65 355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00