Mains water supply processing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9493931
APP PUB NO 20110290331A1
SERIAL NO

13173578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Water is supplied from a mains water supply station to a main supply conduit which feeds a plurality of regional supply networks, via respective pressure reducing valves, at respective regional pressures. Each regional supply network has a boundary value for a parameter related to a property of the water, which may be water pressure or concentration of a water treatment agent. Each network has a critical point at which the value of the parameter is deemed least acceptable. Water supply characteristics in respect of each regional supply network are monitored and the water supplied into the main supply conduit is processed to ensure acceptable values of the parameter are maintained at each critical point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • I20 WATER LIMITED;I2O WATER LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burrows, Andrew Soberton, GB 5 97

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00