Solar light collecting mirror and solar thermal power generation system having solar light collecting mirror

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9494338
SERIAL NO

14128475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar light collecting mirror includes a reflective section which is elastically deformable, and a frame which is elastically deformable and configured to support the reflective section. A central portion of the reflective section is positionally fixed in X and Y directions of the reflective section. A relative position in a Z direction between the central portion of the reflective section and a peripheral portion of the reflective section is changeable. The peripheral portion of the reflective section is not positionally fixed in the X and Y directions. The frame includes warp members which radially extend from a position corresponding to the central portion of the reflective section. And the reflective section is configured to deform elastically together with the frame so as to change the relative position in the Z direction between the central portion and the peripheral portion, whereby a concave mirror structure is obtained.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KONICA MINOLTA INCTOKYO 100-7015

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishida, Kazuo Hachioji, JP 59 550
Takahashi, Yutaka Hino, JP 230 4433

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00