Efficient method of retesting integrated circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9494650
SERIAL NO

13833308

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Efficient production testing of integrated circuits. A first production test is implemented on a group of integrated circuits and failures among the test group are assessed. Specifically, the results of the first test are analyzed such that integrated circuits having a recoverable fail and integrated circuits having a non-recoverable fail are differentiated. The integrated circuits are integrated based on the analyzed results and a second production test is implemented. The second production test tests the integrated circuits responsive to the segregation, such that the second production test is limited only to integrated circuits with a recoverable fail. The next succeeding production test will then use the new test program in the second production test with the handler bin designated as having integrated circuits not to be re-tested.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eng, Teck Seng Singapore, SG 3 1
Gonzales, Michael Russell Uy Quezon Province, PH 5 1
Hermosura, Louie Que Singapore, SG 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00