Using traces of original model to verify a modified model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9495504
APP PUB NO 20150317421A1
SERIAL NO

14267230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method, apparatus and product for using traces of an original model to verify a modified model. The method comprising obtaining a trace exemplifying a checker failing in a model; obtaining a modified model, wherein the modified model is a modified version of the model which was modified in an attempt to resolve the checker failing in the model; re-simulating the trace in the modified model to generate a second trace, wherein said re-simulating is performed by a processor; comparing the trace and the second trace to identify a common prefix, wherein the common prefix ends immediately before a cycle in which a state according to the trace is different than a state according to the second trace; and guiding verification of the modified model using values derived from the common prefix.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auerbach, Gadiel Ramat Hahayal, IL 10 958
Copty, Fady Ramat Hahayal, IL 30 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 15, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 15, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00