Pressurized gas reservoirs including an elastomeric wall

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9499145
APP PUB NO 20140299215A1
SERIAL NO

14247247

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pressurizable gas reservoir can include a first end member and a second end member that is disposed in longitudinally-spaced relation to the first end member. A flexible reservoir member can extend between opposing first and second ends. The first end secured to the first end member and the second end secured to the second end member. The flexible reservoir member at least partially defines a reservoir chamber between the first and second end members that is capable of storing a quantity of pressurized gas for an extended duration of time. The first and second end members can be maintained in substantially-fixed axial position relative to one another. A suspension system including such a pressurized gas reservoir and a method of assembly are also included.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIRESTONE INDUSTRIAL PRODUCTS COMPANY LLC200 4TH AVENUE SOUTH NASHVILLE TN 37201

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brookes, Graham R Noblesville, US 32 405
Capek, Jeffrey T Fishers, US 4 31
Leonard, Joshua R Noblesville, US 70 441
Moulik, Pradipta N Carmel, US 30 337
Smith, Jason B Avon, US 13 51
Street, Stephen C Carmel, US 27 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00