Water electrolysis gases used as primary fuel to combust materials as secondary fuels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9499452
APP PUB NO 20150096223A1
SERIAL NO

14504251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A primary fuel catalyst used to combust a secondary fuel, the primary fuel comprising the gases produced by water electrolysis. When secondary fuels are combusted by the primary fuel, the by-products include heat, water and other more stable by-product materials. When the secondary fuel is a hazardous waste or a radioactive material and either is bound to thermite before combustion, the by-products are no longer hazardous or have significantly reduced radiation levels after one or more passes. Embodiments of the present invention relate to the method for accelerating the decay of hazardous and/or radioactive waste products, and more particularly they relate to the nuclear transmutation of heavy radioactive elements into lighter ones with shorter half-lives and then finally to stable daughter products. Therefore, the invented process relates to reducing the long-term toxicity of hazardous and/or radioactive waste and to, an economic and effective process facility for doing so.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Courtright, Geoffrey Bonita Springs, US 2 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 22, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00