Hydraulic apparatus comprising an improved assembly of a hydraulic machine and a clutch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9505303
APP PUB NO 20130316874A1
SERIAL NO

13900464

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic apparatus including a machine shaft having a proximal end and a distal end, adapted to drive a cylinder block. A clutch having a clutch shaft having a proximal end and a distal end, and a plurality of friction discs linked to the distal end of the clutch shaft and a plurality of friction discs linked to the proximal end of the machine shaft for selectively engaging the clutch shaft with the machine shaft. The friction discs are disposed radially around the machine shaft. The distal end of the clutch shaft is bell-shaped so as to surround the proximal end of the machine shaft. The bell shape defines an inner space where the proximal end of the machine shaft and the friction discs linked to the clutch shaft are located.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • POCLAIN HYDRAULICS INDUSTRIE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gouzou, Christophe Verberie, FR 10 82
Heren, Jean A Verberie, FR 3 32
Hornacek, Bohdan Trencin, SK 1 3
Kuban, Viktor Trencin, SK 1 3
Lucienne, Philippe Raymond Verberie, FR 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00