Blast furnace installation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9506122
APP PUB NO 20140246815A1
SERIAL NO

14351239

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A blast furnace installation includes a blast furnace and a chute transmission gearbox; the blast furnace having a top cone with a top cone ring arranged thereon for receiving a connection flange of the chute transmission gearbox. The connection flange is directly fixed onto the top cone ring by fixing means for establishing a firm connection between the top cone ring and the connection flange. According to an aspect of the present invention, the connection flange is fixed to the top cone ring in three separated fixation regions (30, 30′, 30″), each fixation region including one or more fixing means. According to a further aspect of the present invention, the blast furnace installation also includes a flexible sealing element arranged around the perimeter of the connection between the top cone ring and the chute transmission gearbox.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PAUL WURTH S A32 RUE D'ALSACE LUXEMBOURG 1122

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Gruiter Christian Fentange, LU 7 7
Hausemer, Lionel Sandweiler, LU 18 28
Lonardi, Emile Bascharage, LU 128 1043
Rocchi, Dominique Joudreville, FR 6 5
Thillen, Guy Diekirch, LU 43 149
Vandivinit, Jeff Dalheim, LU 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00