Piezoelectric vibrator and method of manufacturing piezoelectric vibrator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9509277
APP PUB NO 20160190426A1
SERIAL NO

14976893

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric vibrator has a piezoelectric vibrating reed mounted on an upper layer base substrate through a conductive adhesive, in which the piezoelectric vibrating reed includes a first vibrating arm and a second vibrating arm extending along a first direction and arranged side by side in a second direction, a base supporting the first vibrating arm and the second vibrating arm and a first support arm and a second support arm positioned in the outer side of the first vibrating arm and the second vibrating arm in the second direction and bonded to the upper layer base substrate, in which an extrusion amount of the conductive adhesive in the inner side of the first support arm and the second support arm is smaller than an extrusion amount of the conductive adhesive in the outer side of the first support arm and the second support arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SII CRYSTAL TECHNOLOGY INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Takashi Chiba, JP 678 7609

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00