Method for producing a throttle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9511456
APP PUB NO 20140096390A1
SERIAL NO

14124768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a throttle (34) in a flow channel (24) that extends in a component (8), in particular a valve part, and that is used to control a medium from a control chamber. According to the invention, after formation of the flow channel (24) in the valve part (8), the throttle (34) is stamped by plastically deforming material in the vicinity of the flow channel (24) in the direction of the planned throttle (34), and the plastically deformed material acts in such a manner on a molding tool (50, 57, 58) introduced into the flow channel (24) in the position of the planned throttle (34) that a contour (57, 58) of the molding tool (50) defining the throttle (34) is formed in the flow channel (24). The plastic deformation is effected by a stamping die (40) moved with a defined force, while the contour of the throttle (34) is formed by a tip portion (57, 58) of a counter-die (50) used as the molding tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ROBERT BOSCH GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duarte, Joao Curltlba, BR 2 9
Gueldenberg, Rene Bexbach, DE 1 0
Heintges, Oliver Helleuthal-Losheim, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00