Method for controlling a workability parameter of a concrete in a mixer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9511510
APP PUB NO 20150336290A1
SERIAL NO

14389263

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling at least one workability parameter of a concrete contained in the container of a mixer with a non vertical rotational axis, includes making the container turn at least at least two different rotational speeds; determining, for each of the rotational speeds, a rotary drive torque C of the container, a value of shear stress r of the concrete and a speed gradient γ of the concrete according to the following relationships: τ=T(ω)·C and γ=G(ω). ω where T and G are predetermined functions; determining a relationship of variation of shear stress τ according to the speed gradient γ by extrapolation and/or approximation from the determined values; and providing an indication of the workability parameter of the concrete based on the relationship variation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOLCIM TECHNOLOGY LTDSWITZERLAND ZUG ZUG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blachier, Christian Vienne, FR 6 11
Juge, Cedric L'isle d'abeau, FR 1 7
Lombois-Burger, Helene Lyons, FR 1 7
Roy, Cedric Crachier, FR 7 8
Toussaint, Fabrice Saint-alban de Roche, FR 7 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00