Joint structure for an air nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9511636
APP PUB NO 20130133769A1
SERIAL NO

13653514

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A joint structure for an air nozzle contains a valve joint connected on an air nozzle to fill air, with the air nozzle including outer threads defined around an outer peripheral side thereof. The valve joint includes a body having a hole defined therein, an inlet communicating with the hole, and at least one orifice penetrating from an exterior environment to the hole. At least one limiting member is secured and moves in the at least one orifice and has meshing teeth formed on one end thereof to correspond to the hole. The meshing teeth engage with the outer threads of the air nozzle. The at least one limiting member has a defining segment arranged on another end thereof. A controlling assembly is fitted on the body and is used to control the at least one limiting member to move in the at least one orifice.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIRO TECH CORPNO 260 SONGHUAI RD DACUN TOWNSHIP CHANGHUA COUNTY 515 R O C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuo, Chung-Tsun Changhua County, TW 5 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00