Numerical control device which performs tapping operation by using a main spindle and a feed shaft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9513619
APP PUB NO 20150081084A1
SERIAL NO

14384205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to enable tapping to be performed precisely and with an appropriate machining time irrespective of the diameter of a tapping tool, a configuration of the present invention includes: a program analysis unit (12) that analyzes a loaded machining program and extracts thread-related information in tapping; a gradient determination unit (14) that determines acceleration regarding movement velocity of the main spindle or the feed shaft on the basis of the thread-related information obtained by the program analysis unit (12); and an interpolation and acceleration/deceleration processing unit (13) that generates a movement command for the main spindle and the feed shaft using the acceleration determined by the gradient determination unit (14). In addition, the gradient determination unit (14) varies the acceleration during acceleration/deceleration of the main spindle or the feed shaft in accordance with the diameter of a tapping tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONCHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arata, Shuichi Tokyo, JP 1 15
Nishiwaki, Kenji Tokyo, JP 39 237
Sato, Tomonori Tokyo, JP 123 877

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00