System and method for determining correct execution of software based on baseline and real time trace events

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9514028
APP PUB NO 20140143608A1
SERIAL NO

13976049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment provides a level of assurance regarding correct operation of software. An embodiment creates baseline and real-time measurements of software and compares the measurements to determine whether the software is operating correctly. An application provider may include “tracing elements” in target software application. While producing the application the trace elements are detected and provide trace events, which collectively provide a “baseline trace” indicating proper application execution. The provider supplies the application and the baseline trace to a user. The user operates the application in real-time to produce a “real-time trace” based on the application still having trace elements that produce trace events (which collectively form the “real-time” trace). A comparator compares the baseline and real-time traces. If the traces are within a pre-determined range of each other the user has a level of assurance the software is operating correctly. Other embodiments are included herein.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grawrock, David W Aloha, US 77 1832
Walker, Jesse Hillsboro, US 94 1812

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00