Method for producing anode active material for secondary battery, anode active material for secondary battery, method for producing anode for secondary battery, anode for secondary battery, and secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9515316
APP PUB NO 20150287983A1
SERIAL NO

14396128

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This method for producing an anode active material for a secondary battery is provided with a step for forming titanium dioxide by means of hydrolysis by adding a titanium-containing compound to an acidic aqueous solution, and furthermore, by means of adding a compound containing an alkaline earth metal and a condensed phosphate, the surface of the titanium dioxide is covered by the condensed phosphate containing the alkaline earth metal in a manner so that the amount of elemental phosphorus atoms and the amount of alkaline earth metal are each in the range of 0.1 to 10 mass % with respect to the mass of titanium dioxide, thus synthesizing the anode active material (12).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHOWA DENKO K.K.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohmori, Masahiro Tokyo, JP 76 573
Sanbayashi, Masayuki Tokyo, JP 18 199
Sotowa, Chiaki Tokyo, JP 35 337
Yokouchi, Hitoshi Tokyo, JP 24 180

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00