Method for manufacturing a structure with cellular cores for a turbojet nacelle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9518509
APP PUB NO 20150267613A1
SERIAL NO

14635667

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure related to a method for manufacturing a structure with cellular cores that can be used in a structural panel of a turbojet nacelle, including at least one block of cellular cores. The at least one block of cellular cores includes a central portion with core honeycomb cells, and two side portions each including side honeycomb cells. The side honeycomb cells have edge honeycomb cells situated on edges of a side part of a block, and adjacent honeycomb cells. In particular, the method includes: A) forming junction walls on the side honeycomb cells by opening the edge honeycomb cells, the junction walls being capable of interacting for forming a junction area; B) unfolding the junction walls thus formed in step A; and C) joining the junction walls thus unfolded in step B and belonging to two different side portions end-to-end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VIII GONFREVILLE L'ORCHER 76700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deschamps, Thierry Heuqueville, FR 5 6
Desjoyeaux, Bertrand Sainte Adresse, FR 57 178
Moutier, John Le Havre, FR 8 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00