Load coupling and method for adjusting torsional natural frequency of power train

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9518610
APP PUB NO 20140356047A1
SERIAL NO

13934645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Load couplings, power trains, and methods for adjusting torsional natural frequencies of power trains are provided. In one embodiment, a load coupling includes a first flange, a second flange, and a shaft extending between the first flange and the second flange. The load coupling further includes an annular ring extending radially outward from one of the first flange, the second flange, or the shaft, the annular ring including a plurality of bore holes defined therein, each of the plurality of bore holes including a first opening. The load coupling further includes a first cap connected within one of the plurality of bore holes proximate the first opening, the first cap deformable such that an interference fit is created with the one of the plurality of bore holes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dimmick, John Herbert Greenville, US 4 5
Graham, Nicholas Simon Greenville, US 9 50
Gutta, Richard Francis Greer, US 5 48
Vincent, Raymond Andrew Fountain Inn, US 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00