Multilayer chip electronic component and board having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9520852
APP PUB NO 20150325378A1
SERIAL NO

14456857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer chip electronic component may include: a ceramic body including a plurality of dielectric layers; an inductor part disposed within the ceramic body; a capacitor part disposed within the ceramic body; a first dummy electrode disposed within the ceramic body and a second dummy electrode disposed within the ceramic body; and first to sixth external electrodes disposed on first and second main surfaces of the ceramic body, a first connection terminal disposed on the second main surface and first end surface of the ceramic body, and a second connection terminal disposed on the second main surface and second end surface of the ceramic body. The inductor part may include first and second inductor parts, and the inductor part and the capacitor part are connected to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRO-MECHANICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Park, Min Cheol Suwon-Si, KR 176 1814
Park, Sang Soo Suwson-Si, KR 263 2437

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00