Stainless steel brake disc and method for production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9523402
APP PUB NO 20150101898A1
SERIAL NO

14394624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a stainless steel brake disc which is excellent in toughness, corrosion resistance, and wear resistance, and comprises, in % by mass, 0.030 to 0.080% of C, 0.05% to 1.0% of Si, 1.0 to 1.5% of Mn, 0.035% or less of P, 0.015% or less of S, 11.0 to 14.0% of Cr, 0.01 to 0.50% of Ni, 0.001 to 0.15% of V, less than 0.1% of Nb, 0.05% or less of Ti, 0.05% or less of Zr, 0.05% or less of Al, 0.015 to 0.060% of N, 0.0002% or more and 0.0050% or less of B, and 0.0080% or less of O, wherein an AT value of equation 1 is 0.055 to 0.090, equation 2 is satisfied, a ferrite phase fraction, in which an IQ value of an EBSD pattern is 4,000 or more, is 1% to 15%, a Charpy impact value is 50 J/cm2 or more, and hardness is 32 to 38 HRC.

description='In-line Formulae' end='lead'C+0.8(N−B)  (1)description='In-line Formulae' end='tail'

description='In-line Formulae' end='lead'PV=1.2Ti+0.8Zr+Nb+1.1Al+O≦0.1  (2)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL & SUMIKIN STAINLESS STEEL CORPORATIONCHIYODA-KU TOKYO 100-0004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Yoshiharu Tokyo, JP 60 771
Kobayashi, Masaaki Tokyo, JP 291 3632
Koyama, Yuji Tokyo, JP 53 148
Tanoue, Toshio Tokyo, JP 18 63
Teraoka, Shinichi Tokyo, JP 31 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00