Switching power supply using in device having high peak current characteristic

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9525343
APP PUB NO 20160013717A1
SERIAL NO

14798532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching power supply is provided and connected between external voltage source and a device having high peak current characteristic, the switching power supply comprises boost converter, control circuit and energy storing element. An input end of boost converter is connected to external voltage source, and output end of boost converter is electrically connected to the device. A control circuit is connected to boost converter in parallel. A first predetermined voltage value and a predetermined current value is set in control circuit. When output current of external voltage source is larger than predetermined current value or output voltage of external voltage source is lower than first predetermined voltage value, output voltage of boost converter is reduced to be lower than the voltage of energy storing element by control circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIMPOWER TECHNOLOGY INCTAIPEI CITY 114

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Dong-Sheng Taipei, TW 24 474
Lin, Chia-Wei Taipei, TW 53 186
Lin, Kuang-Feng Taipei, TW 6 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00