Process for preparing a paraffin product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528049
APP PUB NO 20150353837A1
SERIAL NO

14758073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for preparing a paraffin product from a carbonaceous feedstock comprising (a) partial oxidation of the carbonaceous feedstock to obtain a mixture comprising hydrogen and carbon monoxide, (b) performing a Fischer-Tropsch reaction using the mixture as obtained in step (a) and recovering an off-gas from the Fischer-Tropsch reaction and a paraffin product, (c) subjecting at least a part of the off-gas from the Fischer-Tropsch reaction to conversion using a catalyst comprising iron, or a catalyst comprising iron and chromium, followed by a hydrogenation step (d) using a steam/off-gas mol ratio in the range of between 0.5 and 1.5 and a catalyst comprising copper and zinc, followed by a conversion step (e) using a nickel based catalyst, and (f) preparing a hydrogen comprising gas from at least a part of the off-gas from the Fischer-Tropsch reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SHELL OIL COMPANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fleys, Matthieu Simon Henri Amsterdam, NL 7 10
Goswami, Tathagata Amsterdam, NL 4 6
Jonckers, Arjan Allert Amsterdam, NL 6 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00