Downhole power generation using a mud operated pulser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528349
APP PUB NO 20150260014A1
SERIAL NO

14374622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to generating electricity downhole using a mud-operated pulser. A disclosed example embodiment of a mud pulser system includes a piston assembly movably disposed within a housing, comprising a power piston, and configured to move in response to a pressure from a fluid flow, a control valve having an open state, in which the power piston receives the fluid flow, and a closed state, in which the power piston does not receive the fluid flow, a magnet disposed on the housing or the piston assembly, and a coil disposed on the housing or the piston assembly, wherein the magnet is configured to displace relative to the coil in response to movement of the piston assembly within the housing, such that relative movement of the magnet and the coil generates electrical energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zimmerman, Mark Houston, US 20 1412

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00