Fireplace assembly with biomass fuel delivery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528707
APP PUB NO 20130160757A1
SERIAL NO

13595974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A biomass-burning fireplace assembly with a hopper and an outlet adjacent to the hopper outlet. A fuel metering assembly is adjacent to the hopper outlet and the barrier member. The fuel metering assembly has a fuel metering receptacle that receives the biomass fuel from the hopper. The fuel metering receptacle is moveable relative to the hopper between first and second positions on opposite sides of the barrier member. The barrier member is a physical barrier between the fuel metering receptacle and the hopper outlet when in the second position. A fuel feed assembly receives fuel from the fuel metering receptacle when is in the second position. The fuel feed assembly moves the fuel onto a burn platform assembly coupled to the firebox adjacent to the fuel inlet opening.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MEASUREMENT SPECIALTIES, INC.;TRAVIS INDUSTRIES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atemboski, Alan R Renton, US 19 180
Fotheringham, William Ross Everett, US 6 12
Gallion, Travis Everett, US 1 4
Lee, Homer Vancouver, CA 4 41
Rumens, Kurt W F Snohomish, US 37 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00