Method and system for regulation of cooling capacity of a cooling system based on a gas expansion process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9528758
APP PUB NO 20100236286A1
SERIAL NO

12734937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and associated system for regulation of the cooling capacity of a cooling system that uses a gas expansion cooling circuit where the cooling principle is expansion of one or more gaseous cooling medium streams from a higher pressure to a lower pressure are described, characterised by the following steps: —reducing the amount of cooling medium which is circulated in the cooling circuit (100) temporarily in that a fraction of gaseous cooling medium is pre-cooled at a higher pressure and is extracted from the cooling circuit (100), —expanding the fraction of cooled gaseous cooling medium across an expansion device (102) to a lower pressure so that at least one part of liquid cooling medium separates, —separating the liquid from the non-condensed gas for temporary storage in a storage unit (104) so that the liquid is temporarily not circulated in the otherwise closed cooling circuit (100), —thereafter to return temporarily stored gaseous cooling medium from the storage unit (104) to the cooling circuit (100) according to need, and—returning non-condensed gas and evaporated cooling medium from the storage unit (104) to a suitable location in the cooling circuit (100). A system to reduce the cooling capacity of a cooling installation based on gas expansion cooling, is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARAGON AS5072 BERGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nilsen, Inge L Bergen, NO 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00