Method for manufacturing Sr ferrite particle for sintered magnet, method for using Sr ferrite particle, Sr ferrite sintered magnet and method for manufacturing same, and motor and generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9530548
APP PUB NO 20150125700A1
SERIAL NO

14404072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for producing Sr ferrite particles for sintered magnets, the method includes: a mixing step of mixing an iron compound, a strontium compound, and an alkali metal compound which includes at least one of K and Na as a constituent element and which does not include Cl and S as the constituent element to prepare a mixture; and a calcining step of firing the mixture at 850° C. to 1100° C. to obtain Sr ferrite particles in which an average particle size of primary particles is 0.2 to 1.0 μm. In the mixing step, the alkali metal compound is mixed in such a manner that a total amount of K and Na becomes 0.03 to 1.05% by mass in terms of K2O and Na2O with respect to a total amount of a powder of the iron compound and a powder of the strontium compound.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TDK CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Taguchi, Hitoshi Tokyo, JP 31 317

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00