Magnetic tunnel junctions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9530959
APP PUB NO 20160308122A1
SERIAL NO

14687280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a magnetic electrode of a magnetic tunnel junction comprises forming non-magnetic MgO-comprising material over conductive material of the magnetic electrode being formed. An amorphous metal is formed over the MgO-comprising material. Amorphous magnetic electrode material comprising Co and Fe is formed over the amorphous metal. The amorphous magnetic electrode material is devoid of B. Non-magnetic tunnel insulator material comprising MgO is formed directly against the amorphous magnetic electrode material. The tunnel insulator material is devoid of B. After forming the tunnel insulator material, the amorphous Co and Fe-comprising magnetic electrode material is annealed at a temperature of at least about 250° C. to form crystalline Co and Fe-comprising magnetic electrode material from an MgO-comprising surface of the tunnel insulator material. The crystalline Co and Fe-comprising magnetic electrode material is devoid of B. Other method and non-method embodiments are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kula, Witold Gilroy, US 103 3059
Sandhu, Gurtej S Boise, US 1217 32397
Siddik, Manzar Singapore, SG 32 194

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00