Method for producing sintered ore

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9534272
APP PUB NO 20150167114A1
SERIAL NO

14414867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for producing sintered ore in which air above a charged layer containing a gaseous fuel supplied from a plurality of gaseous fuel supplying devices installed in a machine length direction on a downstream of an ignition furnace of a sintering machine is sucked by a wind box disposed below a pallet and is introduced into the charged layer, and the gaseous fuel and the carbon material are combusted inside the charged layer to produce the sintered ore, wherein a total amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices is set to be constant, the amount of supply of the gaseous fuel supplied from each gaseous fuel supplying devices is increased or decreased depending on an amount of air sucked into the charged layer in a region which each gaseous fuel supplying device is installed, thereby optimizing a supply ratio of the gaseous fuel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATIONTOKYO 100-0011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwami, Yuji Fukuyama, JP 5 2
Nushiro, Koichi Chiba, JP 6 17
Yamamoto, Tetsuya Kurashiki, JP 636 13176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00