Method for the continuous sintering of mineral material and sintering equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9534844
APP PUB NO 20130130186A1
SERIAL NO

13813622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method and equipment for the continuous sintering of mineral material in a sintering furnace (S). In the method, a material bed (2) is formed on a conveyor base (1), the material bed (2) is conveyed by the conveyor base (1) through the process zones (I-VII) of the sintering furnace that have different temperatures, the zones including at least one drying zone (I), at least one cooling zone (VII), and at least one other process zone (II, III, IV, V, VI) between the said drying zone and cooling zone, and gas is conducted through the conveyor base and the material bed (2), when the material bed travels through the process zones (I-VII), and gas is circulated in a circulation gas duct (3) from the last cooling zone (VII) to the drying zone (I). Part of the gas flow that is conducted to the drying zone (I) in the circulation gas duct (3) is removed as an exhaust gas flow (B) by the exhaust gas blower (5) of an exhaust gas duct (4). The volume flow of the exhaust gas flow (B) is regulated by regulating the blowing power of the blower (5) to control the temperature of the gas flow travelling through the material bed in the drying zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OUTOTEC (FINLAND) OY;OUTOTEC OYJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oikarinen, Päivi Kokkola, FI 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00