User equipment, method, and system for determining, reporting, distributing resource for multiple carriers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9537622
APP PUB NO 20140301314A1
SERIAL NO

14271995

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method, a user equipment (UE) and a communication system are provided. In the disclosure, a UE configured with multiple carriers determines whether a first, a second, and a third conditions are met, and then determines whether resources allocated for the UE on the carrier are sufficient or not accordingly. The first condition defines that the UE is transmitting as much scheduled data as allowed by a current service grant on the carrier. The second condition indicates that the UE has enough transmission power available to transmit data at higher data rate on the carrier. The third condition indicates total buffer data requires more than a preconfigured time period to be transmitted through the carrier together with at least one of other carriers among the multiple carriers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Chuanfeng Beijing, CN 150 210
Ma, Jie Beijing, CN 196 928
Wang, Haidan Shanghai, CN 4 3
Zhang, Cunfei Beijing, CN 3 3
Zhang, Yi Shanghai, CN 1567 13461

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 3, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 3, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00