Material removal from balloon cone

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9539692
APP PUB NO 20160045275A1
SERIAL NO

14460495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A material-removing machine for removing material from a cone section of a medical balloon includes a material-removing element operatively connected to a prime mover such that operation of the prime mover imparts rotation to the material-removing element about a rotational axis. The material-removing element includes an interior surface defining a generally conical-shaped cavity extending along the rotational axis and adapted to receive at least a longitudinal portion of a cone section of an expanded medical balloon for removing material from the longitudinal portion of the cone section to reduce a wall thickness of the cone section. Material may be removed continuously around a 360-degree exterior perimeter of the longitudinal portion of the cone section of the medical balloon to reduce the thickness of the balloon wall defining the cone section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVIDIEN LP15 HAMPSHIRE STREET MANSFIELD MA 02048

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schneider, Mark Mound, US 83 2135
Steele, Bradley Plymouth, US 20 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00