External power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9539903
APP PUB NO 20160068066A1
SERIAL NO

14785157

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

External power supply system includes an electrical storage device, motor, inverter that drives the motor by using electric power of the electrical storage device, and a control device controls the inverter. The inverter includes a first and second switching elements connected in series with each other between a positive and negative electrode power supply lines. A connection-node of the first and second switching elements is connected to one corresponding stator coil. The control device inputs signals to the inverter to drive the inverter such that voltage at the neutral point becomes a predetermined value. The control device compensates for signals in dead time period, the period in which off-state signals are supplied to the first and second switching elements, on the basis of current that is input from the connection-node to one corresponding stator coil or output from one corresponding stator coil to the connection-node while an engine is driven.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kinomura, Shigeki Toyota, JP 90 475
Ueda, Shingo Toyota, JP 6 44
Umeno, Takaji Nisshin, JP 52 919
Watanabe, Yoshitoshi Nagoya, JP 8 134

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00