Process for producing syngas using plasma gasifiers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9540579
APP PUB NO 20150166914A1
SERIAL NO

14631214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for gasification of solid feed material to produce a syngas includes: providing a plasma heated carbonaceous bed in a bottom section of a reactor vessel; forming a bed of deposited feed material on top of the carbonaceous bed; reacting the feed material with hot gases rising from the bottom section; forming, in a middle section of the reactor vessel, a syngas mixture containing a varying quantity of unreacted particles of the feed material; allowing the syngas mixture to rise into a top section of the reactor vessel; and at least partially quenching, by injecting a quench fluid including water, steam, or a mixture thereof, in a second, upper part of the top section, at least some of the unreacted particles sufficiently to reduce the number of unreacted particles exiting the reactor vessel that are likely to be deposited on walls of external ductwork.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTER NRG INTERNATIONAL CORP700 KERR STREET OAKVILLE ONTARIO L6K 3W5 OAKVILLE ONTARIO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chavda, Surendra Calgary, CA 5 11
Gorodetsky, Aleksandr Calgary, CA 19 103
Kukadiya, Sureshkumar Calgary, CA 2 0
Santoianni, James Greensburg, US 14 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00