Method for preparing lithium iron phosphate nanopowder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9543582
SERIAL NO

14510356

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for preparing a lithium iron phosphate nanopowder, including the steps of (a) preparing a mixture solution by adding a lithium precursor, an iron precursor and a phosphorus precursor in a triethanolamine solvent, and (b) putting the mixture solution into a reactor and heating to prepare the lithium iron phosphate nanopowder under pressure conditions of 1 bar to 10 bar, and a lithium iron phosphate nanopowder prepared by the method. When compared to a common hydrothermal synthesis method, a supercritical hydrothermal synthesis method and a glycothermal synthesis method, a reaction may be performed under a relatively lower pressure. Thus, a high temperature/high pressure reactor is not necessary and process safety and economic feasibility may be secured. In addition, a lithium iron phosphate nanopowder having uniform particle size and effectively controlled particle size distribution may be easily prepared.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LG CHEM, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Seung Beom Daejeon, KR 57 252
Jun, In Kook Daejeon, KR 12 86
Oh, Myoung Hwan Daejeon, KR 28 159

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 10, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 10, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00