Energy use in elevator installations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9546072
APP PUB NO 20140166407A1
SERIAL NO

14097514

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An elevator installation with an elevator unit, which is connected with a power supply mains, is controllable by an elevator control with consideration of first control information based on local requirements of users. The elevator control receives from the power supply mains second control information containing status data for the power supply mains. The first and second control information is evaluated by the elevator control. The elevator control influences operation, which is determined by the first control information, of the elevator installation in dependence on the second control information so as to enable desired operation in terms of energy. A monitoring unit, which determines status data for the power supply mains and provides information for the consumers, is connectible with the power supply mains. The monitoring unit creates second control information for the elevator control in dependence on loading of the power supply mains.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INVENTIO AGSEESTRASSE 55 HERGISWIL 6052

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sonnenmoser, Astrid Hochdorf, CH 36 195

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 17, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00