Method and device for producing a composite molded part from fiber-reinforced plastic

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9550331
APP PUB NO 20130099427A1
SERIAL NO

13640324

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a composite molded part from fiber-reinforced plastics material includes providing a prepreg semi-finished product including fibers that are pre-impregnated with a matrix material and encasing the semi-finished product with a flexible sheet material to form an inner arrangement. The flexible sheet material includes a gas-permeable membrane and an inner planar gas-conducting element. The inner arrangement is encased with a first gas-tight casing and positioned on a molding surface of a mold. The inner arrangement and molding surface is encased with a second gas-tight casing. A first negative pressure is applied to the inner planar gas-conducting element and the inside of the first gas-tight casing, and the entire arrangement is heated for a first time at a first temperature. A second negative pressure is applied to an inside of the second gas-tight casing and the entire arrangement is heated for a second time at a second temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EADS DEUTSCHLAND GMBH85521 OTTOBRUNN
PREMIUM AEROTEC GMBH86179 AUGSBURG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Klug, Markus Dachau, DE 27 39
Llopart, Prieto Llorenc Munich, DE 1 1
Neumaier, Rainer Unterschleissheim, DE 1 1
Scholler, Jochen Grossaitingen, DE 6 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00