Al-based alloy sputtering target and Cu-based alloy sputtering target

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9551065
APP PUB NO 20130306468A1
SERIAL NO

13981414

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Film-formation rate can be increased in the pre-sputtering and in the subsequent sputtering onto a substrate or the like, and sputtering failures such as splashes can be inhibited, by making an Al-based alloy or Cu-based alloy spurting target fulfill the following requirements (1) and/or (2) when the total area ratio of crystal orientations <001>±15°, <011>±15°, <111>±15°, <112>±15°, and <012>±15° in the sputtering surface normal direction in the depth within 1 mm from the uppermost surface of the sputtering target is referred to as a P value: (1) the area ratio PA of <011>±15° to the P value: 40% or lower; and (2) the total area ratio PB of <001>±15° and <111>±15° to the P value: 20% or higher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KOBELCO RESEARCH INSTITUTE, INC.;KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Katsushi Kobe, JP 54 412
Nakai, Junichi Takasago, JP 77 1074
Takagi, Toshiaki Takasago, JP 33 901

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00