Solar-powered lighting device and charging system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9553481
APP PUB NO 20140239717A1
SERIAL NO

14191070

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A freestanding solar-powered charging system includes a baseplate, a substantially vertical frame member having a first end and a second end, the first end coupled to and extending from the baseplate, one or more panels coupled to the second end of the vertical frame member, each of the panels having an upper surface with a photovoltaic cell, an energy storage device electrically coupled to the photovoltaic cell, and one or more electrical connectors supported by the vertical frame member and electrically coupled to the energy storage device, the electrical connectors configured to engage any one or more of a plurality of consumer electronic devices for charging the consumer electronic devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOAL ZERO LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bajpai, Avi Brooklyn, US 17 322
Brunner, Todd Brooklyn, US 37 207
Chung, Pil Ho Jersey City, US 30 188
Ford, Walker Holladay, US 22 501
Gardner, Robert Norman Highland, US 1 26
O'Leary, Kevin Brooklyn, US 44 495
Perry, Marco Brooklyn, US 71 732
Prommel, Mark Brooklyn, US 79 652
Vasefi, Keyvan Payson, US 19 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 24, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 24, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00