Construction vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9556590
APP PUB NO 20150139767A1
SERIAL NO

14405407

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention includes a hydraulic pump (9), a working implement (107) having a lift cylinder (13) driven by a hydraulic fluid supplied from the hydraulic pump (9), an operating device (104) for operating the working implement (107), a traveling motor (7) for driving wheels, and a main controller (100). When the lift cylinder (13) fails to operate despite an extending instruction being imparted to the lift cylinder (13) via the operating device (104), the main controller (100) reduces a limit value for an increase rate of a torque required in the traveling motor (7) to a value smaller than that applied when the lift cylinder (13) operates. With this configuration, occurrence of wheel slip during lifting of an object to be carried can be reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higurashi, Masaki Tsuchiura, JP 24 615
Ishida, Kazuo Tsuchiura, JP 59 550
Itou, Noritaka Tsuchiura, JP 11 71
Kaneko, Satoru Tokyo, JP 126 2165
Kikuchi, Toru Tsuchiura, JP 60 563
Kotaka, Toshio Tsuchiura, JP 2 37
Moriki, Hidekazu Tokyo, JP 66 330
Sekino, Satoshi Tsuchiura, JP 21 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00