Apparatus for manufacturing molten metal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9557109
APP PUB NO 20120200013A1
SERIAL NO

13501068

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for manufacturing molten metal has a stationary electric furnace, a raw material charging chute, and exhaust duct and a secondary combustion burner in the furnace top, and a shock generator. The raw material charging chute is in one end of the furnace in a width direction and an electric heating region is spaced from the raw material charging chute in the width direction. A raw material layer having a sloping surface extends downward from the one end of the furnace having the raw material charging chute toward the electric heating region, the sloping surface supporting a metal agglomerate raw material layer. The shock generator is provided at least partially within the raw material and extends to the sloping surface, to be in contact with the metal agglomerate raw material layer, and to mechanically overcome hanging of the metal agglomerate raw material layer on the sloping surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA KOBE SEIKO SHO (KOBE STEEL, LTD.);KOBE STEEL, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tetsumoto, Masahiko Kobe, JP 19 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 31, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00