Throttle device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9557745
APP PUB NO 20130256573A1
SERIAL NO

13852420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A throttle device for varying the pressure of a fluid in a plurality of parallel outlets includes a fluid collector having at least an internal chamber, an inlet and a plurality of outlets for the fluid, and a control element displaceably mounted in the internal chamber of the fluid collector and comprises a plurality of orifices, the cross-section of which can be varied by a relative movement of the control element in relation to the fluid collector. The control element is a sleeve, wherein the orifices are disposed in the sleeve such that they correspond to the outlets of the fluid collector, wherein between the sleeve and the fluid collector seals are provided, such that in a region between of an outside surface of the sleeve and an inside surface surrounding the internal chamber of the fluid collector no fluid communication takes place between the orifices of the sleeve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BALCKE-DURR GMBH46049 OBERHAUSEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoffmann, Klaus Neuss, DE 113 1296
Klitzing, Birger Krefeld, DE 2 44
Seffrin, Florian Darmstadt, DE 1 1
Stockfisch, Bernhard Meerbusch, DE 1 1
Telgen, Thomas Ratingen, DE 3 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 31, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00