Torrefaction reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562194
APP PUB NO 20150225649A1
SERIAL NO

14178097

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A torrefaction reactor includes a preheater section and a torrefaction section arranged to receive the biomass material from the preheater section. The preheater section includes a plurality of preheater plates arranged to facilitate the flow of the biomass material between the preheater plates by the force of gravity, each of the preheater plates facilitates a flow of a preheater fluid through the preheater plate for heating the biomass material. The torrefaction section includes a plurality of torrefaction plates arranged to facilitate the flow of the biomass material between the torrefaction plates by the force of gravity, each the torrefaction plates facilitates a flow of a torrefaction fluid through the torrefaction plate for heating the biomass material to the torrefaction temperature, and a first and second torrefaction purge gas openings to facilitate a flow of a torrefaction purge gas for providing an oxygen-depleted environment within the torrefaction section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLEX THERMAL SCIENCE INC4720-106 AVENUE S E SUITE 250 CALGARY T2C 3G5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byman, Ashley Dean De Winton, CA 5 23
Kellens, Marc Jules Adelin Ghislain Muizen, BE 2 10
Skold, Farah Calgary, CA 2 10
Van, Bommel Bernhard George Hoogerheide, NL 4 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00