Method for controlling gear shift

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9562592
APP PUB NO 20160091063A1
SERIAL NO

14863666

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for controlling a power-split gear shift device in a vehicle by providing an electric variator and a transmission with variable gear shift and connecting a drive motor to a traction drive of the vehicle. The electric variator has a compound gear train with at least one first and at least one second electric machine. The method also includes providing a controller for the electric machines for steplessly varying a gear shift of the compound gear train. Upon detection of an external power requirement by an electric consumer, a gear shift region of the transmission with variable gear shift is set to operate the first electric machine in a generator mode and to operate the second electric machine to compensate for an existing power deficit or a power excess relative to an external power demand.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fritz, Norbert Ilvesheim, DE 39 251
Gugel, Rainer Plankstadt, DE 52 575
Jeffries, Dennis L Waterloo, US 12 389
Mueller, David Stutensee, DE 58 563
Rekow, Andrew K Cedar Falls, US 18 453

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00