Metal complex dye, photoelectric conversion element, dye-sensitized solar cell, dye solution, and compound

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9564274
APP PUB NO 20140290746A1
SERIAL NO

14301796

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A photoelectric conversion element, having: an electrically-conductive support; a photoconductor layer having a semiconductor fine-particle layer adsorbed a dye; a charge transfer layer containing an electrolyte; and a counter electrode; which are provided on one side of the support in this order, in which the dye has at least one terdentate ligand having at least one acidic group; at least one ligand coordinating to a metal atom M has an sp2 carbon atom; a cyclic group binds to the sp2 carbon atom; a specific substituent R is substituted at an atom of α- or β-position to the atom of the cyclic group directly binding to the sp2 carbon atom; and with the metal atom M, an atom G1 of the α- or β-position, and an atom G2 of the substituent R, an angle θ (∠MG1G2) is 150° or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUJIFILM CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kobayashi, Katsumi Kanagawa, JP 171 1388
Nomura, Kimiatsu Kanagawa, JP 70 665
Tani, Yukio Kanagawa, JP 38 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00