Power determining method, user equipment, and base station

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9565643
SERIAL NO

14671857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention provide a power determining method, a user equipment, and a base station. The method includes: determining an initial transmit power of each transmission object in a transmission object set; when a sum of initial transmit powers of all the transmission objects in the transmission object set is greater than a maximum transmit power, performing a power reduction operation based on a priority sequence of information corresponding to the transmission objects, so as to acquire an available transmit power of each transmission object in the transmission object set, where a sum of available transmit powers of all the transmission objects in the transmission object set is not greater than the maximum transmit power; and sending each transmission object in the transmission object set according to the available transmit power corresponding to each transmission object in the transmission object set.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Yan Beijing, CN 218 1137
Yan, Zhiyu Beijing, CN 77 459

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 7, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 7, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00